Peningkatan Keterampilan Tenaga Terampil Perencana Dalam Penggunaan Software Civil 3D
Sari
Teks Lengkap:
9 - 17Referensi
Arashpour, M., Bai, Y., Aranda-mena, G., Bab-Hadiashar, A., Hosseini, R., & Kalutara, P. (2017). Optimizing decisions in advanced manufacturing of prefabricated products: theorizing supply chain configurations in off-site construction. Automation in Construction, 84(August), 146–153. https://doi.org/10.1016/j.autcon.2017.08.032
Assaad, R. H., El-adaway, I. H., Hastak, M., & LaScola Needy, K. (2022). The impact of offsite construction on the workforce: required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7). https://doi.org/10.1061/(asce)co.1943-7862.0002314
Barbosa, F., Woetzel, J., Mischke, J., Ribeirinho, M. J., Sridhar, M., Parsons, M., Bertram, N., & Brown, S. (2017). Reinventing construction: A route to higher productivity. Mckinsey Global Insititute, February, 20.
Burson, A. D. (2017). Determining the feasibility of using abandoned big box stores as modular construction factories.
C. Kwiatek. (2018). Impact of spatial cognitive abilities on the effectiveness of augmented reality in construction and fabrication. UWSpace.
Changali, S., Mohammad, A., & Van Nieuwland, M. (2015). The construction productivity imperative. McKinsey Quarterly, June, 1–10.
Choi, J. O., Chen, X. Bin, & Kim, T. W. (2019). Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), 93–105. https://doi.org/10.1080/15623599.2017.1382093
Jones, K. (2020). Construction technology is reshaping the industry. Constructconnect, 1.
Larsson, J., Eriksson, P. E., Olofsson, T., & Simonsson, P. (2014). Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1–2), 83–96. https://doi.org/10.1080/01446193.2013.833666
Nelson, N., & Tamtana, J. S. (2019). Faktor yang memengaruhi penerapan building information modeling (BIM) dalam tahapan pra konstruksi gedung bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 2(4), 241. https://doi.org/10.24912/jmts.v2i4.6305
DOI: https://doi.org/10.33387/jepk.v1i2.5166
Refbacks
- Saat ini tidak ada refbacks.
Editorial Office :
Program Studi Magister Teknik Sipil, Pascasarjana Universitas Khairun
Jl. Jusuf Abdulrahman Kotak Pos 53 Gambesi, Kota Ternate, Indonesia.