[1]
Ismail, R. et al. 2026. Evaluation of Production Facility Layout to Minimize Backtracking: A Case Study of Green Tea Production at Factory X. Journal Of Science and Engineering. 9, 2 (Oct. 2026), 68–79. DOI:https://doi.org/10.33387/josae.v9i2.11821.