Ahadian, E. R., K. Misbah, Z., & Taher, N. (2021). FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK KONSTRUKSI DI KOTA TERNATE. Journal Of Science and Engineering, 4(2), 158–166. https://doi.org/10.33387/josae.v4i2.4168