AHADIAN, Edward Rizky; K. MISBAH, Zulkarnain; TAHER, Nurlaela. FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK KONSTRUKSI DI KOTA TERNATE. Journal Of Science and Engineering, [S. l.], v. 4, n. 2, p. 158–166, 2021. DOI: 10.33387/josae.v4i2.4168. Disponível em: https://ejournal.unkhair.ac.id/index.php/josae/article/view/4168. Acesso em: 7 jun. 2026.