Ahadian, E. R., K. Misbah, Z. and Taher, N. (2021) “FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PADA PROYEK KONSTRUKSI DI KOTA TERNATE”, Journal Of Science and Engineering, 4(2), pp. 158–166. doi: 10.33387/josae.v4i2.4168.