Ismail, R. (2026) “Evaluation of Production Facility Layout to Minimize Backtracking: A Case Study of Green Tea Production at Factory X”, Journal Of Science and Engineering, 9(2), pp. 68–79. doi: 10.33387/josae.v9i2.11821.