ANANLISIS MANAJEMEN PELAKSANAAN PADA PROYEK PERBAIKAN RUMAH BAGI MASYARAKAT BERPENGHASILAN RENDAH (RMB) KOTA PAREPARE
Sari
Teks Lengkap:
55-62Referensi
Wibowo, Manajemen Kinerja, Jakarta: Bumi Aksara, 2008.
Santoso, Analisa Overruns Pada Beberapa Tipe Konstruksi, 1999.
A Guide to the Project Manajemen Of Body Knowledge (PMBOK Guide), USA, 2004.
W. I. Ervianto, Teori Aplikasi Manajemen Proyek Konstruksi, Andi, 2004.
I. Soeharto, Manajemen Proyek Dari Konseptual Sampai Operasional, Jakarta: Erlangga, 1995.
A. B. Siswanto and M. A. Salim, Manajemen Proyek, Semarang: CV. Pilar Nusantara, 2019.
G. Elawi, M. Alghantany and D. Kashiwagi, "Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia," Procedia Eingineering, 2016.
R. F. Aziz, "Exploring delay causes of road construction projects in Egypt (Menjelajahi penyebab keterlambatan proyek pembangunan jalan di Mesir)," Jurnal Rekayasa Teknik Sipil dan Lingkungan, vol. 2, no. 1, 2021.
Y. R. Palulun, P. A. Pratasis and J. B. Mangare, "Analisis Faktor Faktor yang Berpengaruh Terhadap Keterlambatan Pada Proyek Jalan di (Provinsi Sulawesi Utara)," Jurnal Sipil Statik, vol. 5, no. 7, 2017.
S. Santoso, Menggunakan SPSS untuk Statistik Non Parametrik, Jakarta: PT. Elex Media Komputindo, 2006.
DOI: https://doi.org/10.33387/sipilsains.v15i2.8681
Refbacks
- Saat ini tidak ada refbacks.
Editorial Office :
Fakultas Teknik. Universitas Khairun | Jl. Jusuf Abdulrahman Kotak Pos 53 Gambesi, Kota Ternate, IndonesiaÂ

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.


.png)