PENGENDALIAN BIAYA DAN WAKTU PROYEK DENGAN METODE ANALISIS NILAI HASIL MENGGUNAKAN MICROSOFT PROJECT
Isi Artikel Utama
Abstrak
Rincian Artikel
Authors who publish with this journal agree to the following terms:
- The copyright of the accepted for publication articles shall be assigned to CLAPEYRON as the publisher of the journal. The intended copyright includes the rights to publish articles in various forms (including reprints).
- CLAPEYRONÂ maintain the publishing rights of the published articles.
- Authors are permitted to republish or disseminate published articles by sharing the link/DOI of the article at CLAPEYRON. Authors are allowed to use their articles for any legal purposes deemed necessary without written permission from CLAPEYRONÂ with an acknowledgment of initial publication to this journal.
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
Referensi
Abrar Husen. 2011. Manajemen Proyek. Andi. Yogyakarta.
Andi Wahju Rahardjo Emanuel., Hapnes Toba dan Yenni M Djajalaksana. 2009. Panduan Lengkap Mengelola Proyek dengan Microsoft Project Professional 2007. Graha Ilmu. Yogyakarta.
Armaini Akhirson Karaini. Pengantar Manajemen Proyek. Seri Diktat Kuliah Universitas Gunadarma. Depok.
Dwi Kartikasari. 2014. Pengendalian Biaya Dan Waktu Dengan Metode Earned Value (Studi Kasus : Proyek Struktur Dan Arsitektur Production Hall-02 Pandaan). Extrapolasi Jurnal Teknik Sipil, Vol. 7 No. 2, hal. 107 – 114, Universitas 17 Agustus 1945.Surabaya.
Endar Pancaningrum., Widi Hartono dan Sugiyarto. 20018. Pengendalian Biaya Dan Waktu Dengan Menerapkan Metode Earned Value Analysis (Eva) Menggunakan Software Microsoft Project 2007 (Studi Kasus Di Proyek Pembangunan Hotel Brothers 2 Solo Baru, Sukoharjo). e-Jurnal Matriks Teknik Sipil, Universitas Sebelas Maret. Surakarta.
Iman Soeharto. 1997. Manajemen Proyek Dari Konseptual Sampai Operasional. Erlangga. Jakarta.
. (2001). Manajemen Proyek Jilid 2. Erlangga. Jakarta
Indri Meiliasari., M. Indrayadi dan Lusiana. Earned Value Analysisterhadap Biaya Dan Waktu Pada Proyek Konstruksi (Studi Kasus Proyek Pembangunan Sarana/Prasarana Pengamanan Pantai). Jurnal Teknik Sipil, Fakultas Teknik, Universitas Tanjungpura.
Irika Widiasanti., dan Lenggogeni. 2013. Managemen Konstruksi. PT. Remaja Rosdakarya. Bandung.
Mitchel Danny Maximilian Pinontoan. 2015. Pengendalian Biaya Dan Waktu Dengan Metode Analisis Nilai Dan Hasil Dengan Microsoft Project 2010 (Studi Kasus : Gedung Mantos Tahap III). Jurnal Sipil Statik Vol.3 No.12 Desember 2015 (787-803) ISSN: 2337-6732, Universitas Sam Ratulangi. Manado.
Rifqi Auzan N., Daniar Rizky S., dan Suharyanto Frida Kistiani. 2017. Pengendalian Biaya Dan Waktu Proyek Dengan Metode Konsep Nilai Hasil (Earned Value). Jurnal Karya Teknik Sipil, Volume 6, Nomor 4, Tahun 2017, 460-470, Universitas Diponegoro. Semarang.
Soemardi. dkk. 2007. Konsep Earned Value Untuk Pengelolaan Proyek Konstruksi. Buku Referensi Konstruksi: Industri, Pengelolaan, Dan Rekayasa. Penerbit ITB. Bandung.