PERENCANAAN PLTS OFF GRID DI DESA TOLONUO SELATAN KECAMATAN TOBELO UTARA KABUPATEN HALMAHERA UTARA

M. Yunus Hi. Abbas, Achmad P A. Sardju

Abstract


Electrical energy continues to increase along with the increasing number of human population and the more modern human lifestyle is one of the causes of energy consumption. The use of several electrical and electronic equipment to support the needs of society in today's modern era. Electrical energy is one of the main human needs in supporting people's daily lives, especially the upper middle class, therefore this need must be fulfilled and its utilization must be used efficiently. The PV mini-grid system requires a very large cost for a village scale from an economic point of view. Apart from the very large initial investment cost of Rp.2. 189.50 0.000,-, in general, if the infrastructure is improved, tourists will use higher electricity consumption, so that the area can improve the economy and village welfare. type of quantitative research. The quantitative aspect of this study is the collection of primary data regarding daily electrical energy needs in South Tolonuo Village using interviews and field observations. The daily energy requirement in South Tolonuo Village is 97 kWh/day or 97,000 Wh/day. To determine the peak power of PLTS, Global Horizontal Irradiance (GHI) data is required.

 


Keywords


PV mini-grid; Tolonuo Village; battery; Solar Panel

References


Abdul Kodir Al Bahar & Achmad Teguh Maulana, 2018, Perencanaan Dan Simulasi Sistem PLTS Off Grid Untuk Penerangan Gedung Fakultas Teknik UNKRIS. vol. 6, H 97-107

Andika Cahya Utama, 2019 Analisa Perbandingan Daya Output PLTS Menggunakan Pantulan Cahaya Kaca Cermin Dan Cahaya Matahari Langsung, H 1-55.

Bagus Ramadhani, 2018, Instalasi Pembangkit Listrik Tenaga Surya Dos & Don’ts H 1- 227) Bachtiar & Syafik, 2016, Rancangan Implementasi Pembangkit Listrik Tenaga Surya (PLTS ) Skala Rumah Tangga Menggunakan Software Homer Untuk Masyarakat Keluruhan Pulau Terong Kecamatan Belakang Padang Kota Batam.

BPS Kab. Halmahera Selatan, 2016 Halmahera Selatan Dalam Angka, Hal 1-410 Hari Satryawan, 2018, Perencangan Solar Home system Di Daerah Terpencil Nusa Tenggara Barat, H 1-15.

Hasnawia Hasan, 2012 Perancangan Pembangkit Litrik Tenaga Surya Di Pulau Saugi,Jurnal Ris.et DanTeknologi Kelautan ( JRTK) vol 10. H 169-180)

Mahmud Idris, 2019 Rancang Panel Surya Untuk Instalasi Penerangan Rumah Sederhana Daya 900 watt. Jurnal Elektronika, listrik dan teknologi terpan v 1 H 17-22.

Muhammda Naim, 2017 Rancangan Sistem Kelistrikan PLTS Off Grid 1000 WATT Di Desa Mahalona kecamatan Towuti Jurnal, Ilmia teknik mesin.vol 9 n 1 H 27-32.

Nino Wananda, 2019, Anlisa Perbandingan Optimasi Pengesian Daya Baterai (ACCU) Pada PLTB. Dan PLTS menggunakan Solar Charger Controler Tipe PWM Dan MPPT,H 1-77.

Sinaga Hamdani 2018 Studi perencaan pembangunan pembangkit listrik tenaga surya studi kasus : Samosir.Jurnal Depertemen teknik elektro, H 1-62.




DOI: https://doi.org/10.33387/josae.v5i1.4921

Refbacks

  • There are currently no refbacks.





Journal PoliciesSubmissionsPeople
 Information



Editorial Office :
Journal Of Science and Engineering
Fakultas Teknik. Universitas Khairun
Jl. Jusuf Abdulrahman Kotak Pos 53 Gambesi, Kota Ternate, Indonesia
.

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.