Analisis Risiko K3 Proyek Gedung Laboratorium Universitas Khairun Menggunakan HIRARC

Authors

  • Asril Hi Djen Fakultas Teknik Program Studi Teknik Sipil Unkhair Ternate
  • Edward Rizky Ahadian Fakultas Teknik Program Studi Teknik Sipil Unkhair Ternate
  • Sabaruddin Sabaruddin Fakultas Teknik Program Studi Teknik Sipil Unkhair Ternate
  • Annisa Rimadantia Samudra Fakultas Teknik Program Studi Teknik Sipil Unkhair Ternate

DOI:

https://doi.org/10.33387/josae.v9i1.11577

Keywords:

HIRARC, risk management, construction project, occupational safety, laboratory building

Abstract

Construction projects have a high level of risk, especially in occupational health and safety aspects. The laboratory building construction project at Khairun University (Unkhair) is a strategic infrastructure development that requires systematic risk management to minimize potential accidents and project losses. This study aims to identify potential hazards, assess risk levels, and determine the highest risk activities in the Unkhair laboratory building project using the HIRARC (Hazard Identification, Risk Assessment, and Risk Control) method. This research employed a quantitative descriptive approach. Primary data were collected through observation, interviews, and questionnaires involving 30 respondents from contractors and subcontractors. Risk assessment was conducted by analyzing likelihood and severity using a risk matrix based on HIRARC standards. The results identified 25 potential hazards categorized into 7 moderate risks, 16 high risks, and 2 extreme risks. Extreme risk levels were found mainly in electrical installation works and lightweight steel installation at height. Recommended risk controls include engineering controls, administrative controls, implementation of standard operating procedures (SOP), certified training, and mandatory use of personal protective equipment (PPE). The study concludes that HIRARC is effective in identifying and prioritizing occupational safety risks in building construction projects and can serve as a practical reference for improving safety performance in similar projects

References

Cahyo, T. A. N., & Sutarto, A. (2022). Analisis Implementasi Manajemen Risiko Pada Pembangunan Museum Dan Galeri Seni SBY*ANI Dengan Hirarc (Hazard Identification, Risk Assessment, and Risk Control). Citizen : Jurnal Ilmiah Multidisiplin Indonesia, 2(1), 71–80. https://doi.org/10.53866/jimi.v2i1.28

Wiryajati, I.K., Adnyani, I. A. S. (2017). Metode Hazard Identification Risk Assessment and Risk Control K3. Jurnal INTECH Teknik Industri Universitas Serang Raya, 3(1), 162.

Giovanni, A., Fathimahhayati, L. D., & Pawitra, T. A. (2023). Risk Analysis of Occupational Health and Safety Using Hazard Identification, Risk Assessment and Risk Control (HIRARC) Method (Case Study in PT Barokah Galangan Perkasa). IJIEM - Indonesian Journal of Industrial Engineering and Management, 4(2), 198. https://doi.org/10.22441/ijiem.v4i2.20398

Ihsan, T, Edwin, T, Irawan, R. O. (2016). Analisis Risiko K3 Dengan Metode HIRARC pada Area Produksi PT Cahaya Murni Andalas Permai. Jurnal Kesehatan Masyarakat Andalas

Rani, Hafnidar A. 2016. Manajemen Proyek Konstruksi. Yogyakarta : CV. Budi Utama

Santoso, D. O., Kurniawan, M. D., & Hidayat, H. (2022). Analisa Risiko Keselamatan dan Kesehatan Kerja Menggunakan Metode HIRARC di PT. INHUTANI 1 UMI GRESIK. Jurnal Media Teknik Dan Sistem Industri, 6(1), 12. https://doi.org/10.35194/jmtsi.v6i1.1580

Simajuntak, J. P. (1994). Manajemen Keselamatan Kerja. Jakarta, HIPSMI.

I Supriyadi, DKK (2017). Identifikasi Bahaya dan Penilaian Risiko pada Divisi Boiler Menggunakan Metode Hazard Identification Risk Assessment And Risk Control (HIRARC). Journal of Industrial Hygiene and Occupational Health.

Ladimu, W. H., Ahadian, E. R., Taufiq, M., Saputra, Y., Nagu, N., & Tuhuteru, E. (2022). Analisis Pengaruh Penerapan Keselamatan Dan Kesehatan Kerja (K3) Terhadap Kinerja Pekerja Pada Proyek Konstruksi Pembangunan Gedung Di Kota Ternate. Clapeyron : Jurnal Ilmiah Teknik Sipil, 3(1), 8–15. https://doi.org/10.33387/clapeyron.v3i1.4591

Samudra, A. R., Utomo Dwi Hatmoko, J., & Wibowo, M. A. (2023). Analisa Faktor Risiko Prioritas Pada Proyek Konstruksi Jembatan. Syntax Literate: Jurnal Ilmiah Indonesia, 8(7).

Downloads

Published

2026-05-05